• Weekly rundown

    Week 14

    Unfortunately, I was unable to attend our studio session in Norwich on Monday due to a doctors appointment needed as a follow up from the appointment the Thursday prior. Consequently, I was unable to receive feedback from Dave during the week, instilling a sense of concern about whether I was…

  • Weekly rundown

    Week 13

    This week, my primary goal was to establish the overall planned design for the app. This approach would provide clarity on areas needing improvement, facilitate necessary changes, and enable me to gather valuable feedback from my tutors. However, my time in the studio was slightly limited as I had to…

  • Project 5

    Animation for app design

    I delved into a bit of animation to inject some personality into the app. Drawing inspiration from the Snapchat ghost and the DuoLingo owl, my goal was to create a character that would be the app’s focal point, transforming it from a mundane to-do app into an enhancer of cooking…

  • Weekly rundown

    Week 12

    This marked the first week back after the three-week break, and it proved to be quite exhausting. Despite our return, the week was intense, and I didn’t feel adequately rested from the break. Consequently, I faced challenges with productivity in my free time. However, during studio sessions, I made significant…

  • Project 6

    Research for project 6

    Embarking on this project, I found myself grappling with the challenge of defining the ideal feel and aesthetic for the video. Aiming for a harmonious blend of the colour palette without venturing into overly vibrant territories, I steered away from excessive colours, acknowledging their potential off-putting nature in a video.…

  • Weekly rundown

    Christmas break

    Over the three-week break, instead of starting new things, I tried to get everything I had already done up to scratch and to a good standard. For example, I worked back into Project 4 and started my first draft of Project 5. Although I was attempting to do some work,…